US Dollar - USD
800-225-8238

Tenacious Testers

HELP US MAKE THE WORKPLACE A BETTERPLACE

BACK TO TENACIOUS TESTERS

Parry Rentz

  • URS washington group
  • 23-Construction 1505
  • Carpenter
  • Scaffold Builder
  • First thing in the morning my crew of four receives a job packet for the scaffolds that need to be built that day. We go into the process part of the refinery and get permits from the operator. Then measure the scaffold then get material and build.

  • 10 yr.

  • The toughest thing is getting our material where we need it . On a lot of locations, we have to build scaffold on top of a 100 foot plus tower. Our small parts usually go up and down in a canvas bag and they get heavy.

  • Building a 120 foot free standing stair tower out of cup lock scaffold.

  • Hard hat ,safety glasses,full body harness,double lanyard,knee pads,fitted grip gloves,frc(fire rated clothes) beam strap and safety toed boots.

  • I love what I do and where I do it (refinery). Eat healthy, try to stay positive.

MY GEAR IN ACTION

My Gear Reviews